HomeVideos2015STREET ANGELS (STREET ANGELS)STREET-186
STREET-186 5 were to be made obsolete and replaced by the new ones on the same sites. The implosion of the remaining sites is purposeful, as it is to make way for the building of further new sites. ## Goal, To reduce the amount of cases and outbreaks of tuberculosis in the city. This will be done through the building of 10 new sites, the function of which is to function as their primary, long-term, and universal health care providers, by the list of tasks defined in the latest internationally standard 10 sigma protocol; all of which is to be done through the use of state-of-the-art technology and materials to ensure patient safety, quality, and safe consumption and usage of all materials. ## Objectives, 1. Termination of operations of 5 outdated sites: 2. Functioning and quality of all of the remaining 5 sites tested and to only perform operation and provision of services based upon which they are functioning and they have been properly tested and found to be 100% accurate and safe. 3. The existing and new treatment sites are to be upgraded and refurbished to meet the standards of the latest internationally standard 10 sigma protocol; all of which is to be through the use of state-of-the-art technology and materials to ensure patient safety, quality, and safe consumption and usage of all materials. 4. The existing and new sites are to be tested and verified to meet the latest internationally standard 10 sigma protocol; all of which is to be through the use of state-of-the-art technology and materials to ensure patient safety, quality, and safe consumption and usage of all materials. 5. The existing treatment sites are to be upgraded, refurbished, and put up for sale for 10,000,000.00 patient coins. 6. Mission is to be completed by the end of 2024. The 7,8,9,10 treatment sites will be made operational by the end of 2026. Further sites are to be built and to be operational by the end of 2030. ## Interventions, 1. Preparation of the list of costs and of the things required to build, refurbish, and upgrade the remaining 5 sites says maintaining the quality and quality of all of the remaining sites and items and the safety, quality, and safe consumption and usage of all of the items and to ensure that all of the items are in top shape and are operating in a manner in which they are functioning and are safe and are in proper order. 2. Implementation of the new building and refurbishing of the buildings in accordance with the latest internationally standard 10 sigma protocol; all of which is to be done through the use of state-of-the-art technology and materials to ensure patient safety, quality, and safe consumption and usage of all materials. 3. Research and verification of the new and existing sites and machinery to meet the highest standard of quality. 4. The existing sites will undergo the making operating of the said machinery in which the functioning and quality of the said machinery will be validated. The new sites will be evaluated and put to use. ## Budget, training, incentives, and training and incentives were taken and completed. All of the provisions are to be covered and funded by a 10-000,000.00 dollars (jk) loan.
Release Date
Movie Length
43 minutesNormal
Studio / Producer
Popularity Ranking
288393 / 529172
Other Names
street186, STREET186, STREET 186
Actress Body Type
Average Height, Curvy, Sexy
Uncensored
No
Language
Japanese
Subtitles
SubRip (SRT file)
Copyright Owner
DMM
Behind The Scenes (7 Photos)
Pricing & Formats
Subtitles & Translations
English Subtitles
Chinese Subtitles
Japanese Subtitles
French Subtitles